LIST OF REFERENCES
Thong, M. P. (2016). A Study on Quality Management
System (QMS) Applied in Construction Project (Doctoral dissertation, UTAR).
Hussin, J. M., Rahman, I.
A., & Memon, A. H. (2013). The way forward in sustainable construction:
issues and challenges. International Journal of Advances in Applied Sciences, 2(1), 15-24.
Said, I., Ayub, A., Razaki, A. A., & Kooi, T. K. (2009). Factors affecting
construction organization quality management system in the Malaysian construction
industry. University Sains Malaysia.
Saadi, N. U. R. Z. A. L. I.
K. H. A., Ismail, Z. U. L. H. A. B. R. I., & Alias, Z. A. R. I. N. A.
(2016). A review of construction waste management and initiatives in Malaysia. Journal of Sustainability
Science and Management, 11(2), 101-114.
Saadi, N., & Ismail, Z.
(2015). Government Initiatives Pertaining to Construction Waste Minimization in
Malaysia. International Journal of
Energy and Environment, 9, 165-170.
Nagapan, S., Rahman, I. A.,
Asmi, A., & Adnan, N. F. (2013). Study of site's construction waste in Batu
Pahat, Johor. Procedia Engineering, 53, 99-103.
Nagapan, S., Rahman, I. A.,
Asmi, A., Memon, A. H., & Latif, I. (2012, December). Issues on
construction waste: The need for sustainable waste management. In 2012 IEEE Colloquium on
Humanities, Science and Engineering (CHUSER) (pp. 325-330). IEEE.
Nagapan, S., Rahman, I. A.,
& Asmi, A. (2012). Factors contributing to physical and non-physical waste
generation in construction industry. International Journal of Advances in Applied Sciences, 1(1), 1-10.
Mohamed, A. F. (2009).
Recycling systems in Malaysia: case studies on industrial waste. 3R policies for southeast and
east Asia. ERIA: Economic Research Institute for ASEAN and East Asia, Jakarta, 53-72.
Begum, R. A., & Pereira,
J. J. (2008). Environmental problems in Malaysia: a view of contractors’
perception. Journal of Applied Sciences, 8(22), 4230-3.
Begum, R. A., Siwar, C.,
Pereira, J. J., & Jaafar, A. H. (2007). Factors and values of willingness
to pay for improved construction waste management–A perspective of Malaysian
contractors. Waste management, 27(12), 1902-1909.
Begum, R. A., Siwar, C.,
Pereira, J. J., & Jaafar, A. H. (2007). Implementation of waste management
and minimisation in the construction industry of Malaysia. Resources, Conservation and
Recycling, 51(1), 190-202.
Rahim, M. H. I. A., Kasim,
N., Mohamed, I., Zainal, R., Sarpin, N., & Saikah, M. (2017, November).
Construction waste generation in Malaysia construction industry: illegal
dumping activities. In IOP conference series: materials science and engineering (Vol. 271,
No. 1, p. 012040).
Hassan, S. H., Ahzahar, N.,
Fauzi, M. A., & Eman, J. (2012). Waste management issues in the northern
region of Malaysia. Procedia-Social and Behavioral Sciences, 42, 175-181.
Begum, R. A., Satari, S. K.,
& Pereira, J. J. (2010). Waste generation and recycling: Comparison of
conventional and industrialized building systems. American Journal of
Environmental Sciences, 6(4), 383.
Othman, I., Ghani, S. N. M.,
& Choon, S. W. (2019). The Total Quality Management (TQM) Journey of
Malaysian Building Contractors. Ain Shams Engineering Journal.
Osman, W. N. B., Udin, Z.
M., & Salleh, D. (2012). Adoption level of sustainable construction
practices: a study on Malaysia's construction stakeholders. Journal of Southeast Asian
Research, 2012, 1.
Muhwezi, L., Chamuriho, L.
M., & Lema, N. M. (2012). An investigation into materials wastes on
building construction projects in Kampala-Uganda. Scholarly Journal of
Engineering Research, 1(1), 11-18.
Zainun, N. Y., Rahman, I.
A., & Rothman, R. A. (2016, November). Mapping of construction waste
illegal dumping using geographical information system (gis). In IOP Conference Series:
Materials Science and Engineering (Vol. 160, No. 1, p. 012049). IOP Publishing.
Rauzana, A. Implementation
of Quality Management System in Construction.
Chin-Keng, T. (2011). Study
of quality management in construction projects. Chinese Business Review, 10(7).
Said, I., Ayub, A., Razaki,
A. A., & Kooi, T. K. (2009). Factors affecting construction organization
quality management system in the Malaysian construction industry. University Sains Malaysia.
Osmani, M. (2012).
Construction waste minimization in the UK: current pressures for change and
approaches. Procedia-Social and Behavioral
Sciences, 40, 37-40.
Yussof, I. TQM and Its
Introduction in Malaysia's Public Service.
Neyestani, B. (2016).
Effectiveness of quality management system (QMS) on construction projects. Available at SSRN 2947712.
Alwerfalli, D., Karatas, A.,
& Alshammari, M. (2017). Application of quality management systems (QMS) in
construction industry. In Proceedings of the International Conference on Industrial Engineering and
Operations Management (p. 46).
Saez, P. V., del Río Merino,
M., González, A. S. A., & Porras-Amores, C. (2013). Best practice measures
assessment for construction and demolition waste management in building
constructions. Resources, Conservation and
Recycling, 75, 52-62.
Keng, T. C., & Kamil, S.
Z. (2016). Implementation of ISO quality management system in construction
companies of Malaysia. Journal of Technology Management and Business, 3(1).
Abo-Zaid, M. A., &
Othman, A. A. E. (2018). Lean construction for reducing construction waste in
the Egyptian construction industry. In Proceedings of 2nd International Conference for Sustainable Construction
and Project Management. Aswan, Egypt.
Ahmed, M. A., Coffey, V.,
& Xia, B. (2017). The requirements of developing a framework for successful
adoption of quality management systems in the construction industry. International Journal of
Social, Behavioral, Educational, Economic, Business and Industrial Engineering, 11(1), 183-191.
Moh, Y. (2017). Solid waste
management transformation and future challenges of source separation and
recycling practice in Malaysia. Resources, Conservation and Recycling, 116, 1-14.
Wahi, N., Joseph, C., Tawie,
R., & Ikau, R. (2016). Critical review on construction waste control
practices: legislative and waste management perspective. Procedia-Social and Behavioral
Sciences, 224(11), 276-283.
Mahayuddin, S. A., Pereira,
J. J., Badaruzzaman, W. H. W., & Mokhtar, M. B. (2008). Construction waste
management in a developing country: case study of Ipoh, Malaysia. WIT Transactions on Ecology
and the Environment, 109, 481-489.
Al-Hajj, A., & Hamani,
K. (2011). Material waste in the UAE construction industry: Main causes and
minimization practices. Architectural engineering and design management, 7(4), 221-235.
Lu, W., & Yuan, H.
(2011). A framework for understanding waste management studies in construction. Waste management, 31(6), 1252-1260.
Tey, J. S., Goh, K. C., Kek,
S. L., & Goh, H. H. (2013). Current practice of waste management system in
Malaysia: Towards sustainable waste management.
Esa, M. R., Halog, A., &
Rigamonti, L. (2017). Strategies for minimizing construction and demolition
wastes in Malaysia. Resources, Conservation and Recycling, 120, 219-229.
Papargyropoulou, E., Preece,
C., Padfield, R., & Abdullah, A. A. (2011, June). Sustainable construction
waste management in Malaysia: A contractor's perspective. In Management and Innovation for
a Sustainable Built Environment MISBE 2011, Amsterdam, The Netherlands, June
20-23, 2011. CIB, Working
Commissions W55, W65, W89, W112; ENHR and AESP.
de Magalhães, R. F.,
Danilevicz, Â. D. M. F., & Saurin, T. A. (2017). Reducing construction
waste: A study of urban infrastructure projects. Waste management, 67, 265-277.
Tam, V. W. (2011). Rate of
reusable and recyclable waste in construction. The open waste management journal, 4(1).
Gangolells, M., Casals, M.,
Forcada, N., & Macarulla, M. (2014). Analysis of the implementation of
effective waste management practices in construction projects and sites. Resources, conservation and
recycling, 93, 99-111.
Comments
Post a Comment